Body 4
Body 2
Body 1
Body 3
Body 5
Provide professional Real estate services

Thao Dien Pearl Apartment

 

Project Location



 
Construction land area is located at 12 Quoc Huong - Thao Dien Ward - District 2 - Ho Chi Minh City has an area of 12,855 m² is the highlight of the villa Thao Dien - An Phu, is a beautiful place located along the Saigon River Saigon bridge and 500m. Design master plan for Hanoi Highway North harmonious combination between the space existing luxury villas, high-rise space near the main transportation, metro, buses along the Hanoi Highway and layout open spaces, riverside landscape in the Saigon River.

The project is located in the planned highway north of Hanoi, the heart of District 2 is focused on building works in the public service in high-urbanization in the city. HCM.

 

 

Located in the overall planning of Hanoi Northern Highway, the project plans to build apartment buildings - stores, services, with basement parking, and convenient location next to metro station No. 6 line is the Ben Thanh Market - Suoi Tien metro route is the city's first project will meet the modern needs for the future residents of the location, service and amenities.

Also, the project is located in the sequence of multi-story buildings followed the Saigon River landscape axis extending from Le Thanh Ton Street - Nguyen Huu Canh - Hanoi Highway in spatial development planning city. Approved by the 2025 HCM City People's Committee. HCM. Typically works Saigon Pearl, The Manor, ... is the project is successfully implemented.

 

Project scale

 

  On an area of 12,855 square meters, the project consortium apartment, commercial Thao Dien Pearl was built with a size of about 33 floors.

- Podium from 1st to 3rd floors used for commercial centers and services with an area of 20,441.18 square meters.

- 27-storey apartments, with 450 apartments with area from 95.19 square meters to 136.96square meters (2 to 3 bedrooms) and 16 Duplex apartments are located on two upper floors of the building is approximately 384 square meters DT

- 2 and 01 underground basement parking back to an area of 28,560.11 square meters

 

 

 

 

Utilities

 

  Project Pearl Talk fill full amenities of a luxury apartment projects such as:

- Major shopping centers: the third floor, especially a direct link to any railway station. Commercial center to help you unleash the purchase of the product class of the famous brands.


- The service area of 5.800 square meters with swimming pool overflow particularly larger banks 10mx50m Thao Dien village overlooks the beautiful Saigon River. There lake and lake aeration individual children.

- The living quarters alternating landscape.

- Community living room at ground floor and service floor.

- International standard room.

- Area locker - shower with steam room and Sauna.

- Kindergartens, children's playground in the outdoor and indoor international standard.

- The automatic drying laundry.

- Professional security force under international and regional control systems 24/24.

 

Typical ground floor apartments and ground

 

 

Typical ground floor

 

Surface of apartment:

 

Apartment 95.19 Sqm
  (2 bedrooms)

 

 

Apartment 95.79 Sqm
  (2 bedrooms)

 

 

Apartment 105.92 Sqm
  (2 bedrooms)

 

 

Apartment 115.19 Sqm
  (2 bedrooms)

 

 

Apartment 122.51 sq meters
  (2 bedrooms)

 

 

Apartment 132.06 Sqm
  (2 bedrooms)

 

 

Apartment 134.5 Sqm
  (2 bedrooms)

 

Apartment 136.96 Sqm

(3 bedrooms)

 

 

Price and Payment

 

Price: from 30.240.000đ/Sqm

 

Payment method

 

Progress payments shall apply from 07 months to December 2011
 


The time for customers to sign contracts

 

1. July 2011

 

- Stage 1: Pay 15% upon signing contract

- Stage 2: Pay 15% after 4 months from the date of payment of round 1

- Stage 3: Payment of 15% after 4 months from the date of payment of round 2

- Stage 4: Payment of 15% after 4 months from the date of payment of round 3

- Stage 5: Payment of 10% after 4 months from the date of payment of round 4

- Stage 6: Pay 10% after 3 months from the date of payment of round 5

- Stage 7: Payment of 10% after 3 months from the date of payment of round 6

- Stage 8: Payment of 10% after 3 months from the date of payment of round 7

 

2. August 2011

 

- Stage 1: Pay 15% upon signing contract

- Stage 2: Pay 15% after 4 months from the date of payment of round 1

- Stage 3: Payment of 15% after 4 months from the date of payment of round 2

- Stage 4: Payment of 15% after 4 months from the date of payment of round 3

- Stage 5: Payment of 10% after 3 months from the date of payment of round 4

- Stage 6: Pay 10% after 3 months from the date of payment of round 5

- Stage 7: Payment of 10% after 3 months from the date of payment of round 6

- Stage 8: Payment of 10% after 3 months from the date of payment of round 7

 

3. September 2011

 

- Stage 1: Pay 15% upon signing contract

- Stage 2: Pay 15% after 4 months from the date of payment of round 1

- Stage 3: Payment of 15% after 4 months from the date of payment of round 2

- Stage 4: Payment of 15% after 3 months from the date of payment of round 3

- Stage 5: Payment of 10% after 3 months from the date of payment of round 4

- Stage 6: Pay 10% after 3 months from the date of payment of round 5

- Stage 7: Payment of 10% after 3 months from the date of payment of round 6

- Stage 8: Payment of 10% after 3 months from the date of payment of round 7

 

4. October 2011

 

- Stage 1: Pay 15% upon signing contract

- Stage 2: Pay 15% after 4 months from the date of payment of round 1

- Stage 3: Payment of 15% after 3 months from the date of payment of round 2

- Stage 4: Payment of 15% after 3 months from the date of payment of round 3

- Stage 5: Payment of 10% after 3 months from the date of payment of round 4

- Stage 6: Pay 10% after 3 months from the date of payment of round 5

- Stage 7: Payment of 10% after 3 months from the date of payment of round 6

- Stage 8: Payment of 10% after 3 months from the date of payment of round 7

 

5. November 2011

 

- Stage 1: Pay 15% upon signing contract

- Stage 2: Pay 15% after 3 months from the date of payment of round 1

- Stage 3: Payment of 15% after 3 months from the date of payment of round 2

- Stage 4: Payment of 15% after 3 months from the date of payment of round 3

- Stage 5: Payment of 10% after 3 months from the date of payment of round 4

- Stage 6: Pay 10% after 3 months from the date of payment of round 5

- Stage 7: Payment of 10% after 3 months from the date of payment of round 6

- Stage 8: Payment of 10% after 3 months from the date of payment of round 7

 

6. December 2011

 

- Stage 1: Pay 15% upon signing contract

- Stage 2: Pay 15% after 3 months from the date of payment of round 1

- Stage 3: Payment of 15% after 3 months from the date of payment of round 2

- Stage 4: Payment of 15% after 3 months from the date of payment of round 3

- Stage 5: Payment of 10% after 3 months from the date of payment of round 4

- Stage 6: Pay 10% after 3 months from the date of payment of round 5

- Stage 7: Payment of 10% after 3 months from the date of payment of round 6

- Stage 8: Payment of 10% after 2 months from the date of payment of round 7

 

 

Company Real Estate Proland is the official distributor of the project.

 

You have needs, please contact

 

Company Proland 167 Nguyễn Phúc Nguyên, Ward 10, District 3, HCMC

Phone: 08-62611177-88-99 Fax: 08-62611155

Email: truong.nguyen@proland.com.vn

Website: www.proland.com.vn

 



Or contact

 

Mr Truong: 0909.77.7979

 
Search advanced
Bedroom
Level
Size
Price range
Summary views

Online: 2

Views: 03336